This project was carried out in Rosyth Ship Yard Scotland
The A-Frame was stood up right then lowered to the barge deck using a LR-11350.
This was completely stripped down by DWLS and loaded in to containers and shipped to Spain.
Project images
This project was carried out in Rosyth Ship Yard Scotland
The A-Frame was stood up right then lowered to the barge deck using a LR-11350.
This was completely stripped down by DWLS and loaded in to containers and shipped to Spain.
Project images