Stanks Installation

 

Bespoke designed Beam to lift and remove Lock Gates due to Low clearance with no crane access. Damning river lock gates section due to leaking Lock. 24hr water pump removing 1 million gallons of water for access to remove and replace New Lock Gates installation.