DWLS was commissioned to oversee the 57 Tonne Plough lifted from south side of the River Tyne on to barge and ferried accross to the northside shore. We then offloaded to a transporter and the Plough was taken in to storage for refurbishment.
DWLS was commissioned to oversee the 57 Tonne Plough lifted from south side of the River Tyne on to barge and ferried accross to the northside shore. We then offloaded to a transporter and the Plough was taken in to storage for refurbishment.